Archive for September 21st, 2008
Revibration time limit of concrete - a practical approach
Concreting in one go of high walls, big columns (one meter or more in height) or other similar structures is often done in layers of less than half a meter. In pouring such structures it is very important to ensure that before pouring the next layer the elder layer should still be in its vibratable [...]
Posted: September 21st, 2008 under Construction Technology.
Tags: concrete setting time, revibrationl imit of concrete
Comments: 1